Labuan Bajo Multipurpose Terminal Construction Progress Reaches 85% | KF Map – Digital Map for Property and Infrastructure in Indonesia
Labuan Bajo Multipurpose Terminal Construction Progress Reaches 85%
Monday, 18 January 2021

PT Pelabuhan Indonesia lll (Persero) or Pelindo III accelerates the construction of Labuan Bajo Multipurpose Terminal in West Manggarai, East Nusa Tenggara (NTT). Currently, the construction progress has reached 85%. The construction is done by considering the environment and local wisdoms with the concept of green port which are applied in the shape of the building to the equipment used and by combining modern building with traditional NTT’s architecture.

Share:
Back to News