Hutama Karya Proceeds with the Construction of Phase I Lubuk Linggau-Curup-Bengkulu
Tuesday, 21 April 2020
PT Hutama Karya (Persero) continues the construction of the first section of Lubuk Linggau-Curup-Bengkulu Toll Road, the Bengkulu-Taba Penanjung lane of 17.6 km. The toll road is a part of the construction of JTSS Palembang-Bengkulu Lane which includes Sp. Indralaya-Muara Enim (119 km), Muara Enim–Lubuk Linggau lane (114.5 km) and Lubuk Linggau–Bengkulu lane (95.8 km). The three lanes are the extension of the Palembang-Sp. Indralaya lane which has been operational since 2018.
Back to News